NOISE CONTROL ORDINANCE (EXEMPTION FROM SECTION 6(1) AND (2) (LANTAU FIXED CROSSING)) ORDER
Gazette Number:
Schedule:
1
Heading:
Version Date:
30/06/1997
[paragraph 2]
The locations and the works boundaries for the 24-hour construction of the Lantau Fixed Crossing are more particularly delineated in Drawing Nos. 272/TM/1106 and 272/TM/1107 for the Tsing Ma Bridge Contract and Drawing Nos. 272/KSM/1105 and 272/KSM/1106 for the Kap Shui Mun Bridge/Ma Wan Viaduct Contract deposited in the office of the Highways Department at 10th Floor, Empire Centre at Tsim Sha Tsui East.