Contents of Section

Chapter:

311G PDFTitle:AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993Gazette Number:
Schedule:2Heading:FORMVersion Date:30/06/1997


[section 1]

AIR POLLUTION CONTROL ORDINANCE

(Chapter 311)
NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE
CONDUCT OF A SPECIFIED PROCESS PURSUANT
TO SECTION 19(1)

To: The Authority

1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct.

This notification consists of ............ pages, with associated drawing (........... sheets).

Signature: ..............................................................................................................................

Name: ..................................................................................................................................

Date: ....................................................................................................................................

2. Details of Owner(s)

Name(s) of Owner(s
(Surname First)
Status
(e.g. lessee, occupier)
Correspondence
Address
Telephone
Number
Identity Card/Certificate of
Incorporation*
Number
English
Chinese
3. Premises where the Specified Process is Conducted

Name of Premises
Address
TelephoneNumber
English
Chinese
Contact Person in
the Premises
(Surname First)
Title or Position
Correspondence Address
TelephoneNumber
English
Chinese
Business Registration No.
Certificate of Incorporation No.
No. of Employees in the Premises
Area of the Premises (m2)
Land Status
Names(s) of Land Owner(s)
Address
TelephoneNumber
English
Chinese
4. Nature of Work

Specified Process referred in Schedule 1 to the Ordinance
Brief Description of Process
Raw materials with Percentage
Composition
Products with Percentage Composition
Raw Materials Consumption Rates (tonnes)
Hourly
Normal
Product Production Rates (tonnes)
Hourly
Normal
Maximum
Maximum
Daily
Daily
Monthly
Monthly
Annual
Annual
Installed/Processing* Capacity
Total Silo Capacity (For Cement Works only)
Operating Schedule
Normal Operating Hours
From To
Operating Hours per Day
Operating Days per Year
5. Fuel Using/processing Equipment

Emission Point No.
Discharge Exit or Chimney Height (m above ground)
Cross-section of Discharge Exit or Chimney
Width (m)
Length (m)
Diameter(m)
Equipment Serving the Emission Point
Type of Equipment
Equipment No.
Date of Installation
Dimensions of
Equipment
Width (m)
Length (m)
Height (m)
Diameter (m)
Mode of Operation (Continuous/Batch)
Installed/Processing* Capacity
For Batch Process
Duration of each Batch (h)
No. of Batches per Day
For
Fuel
Using
Equip-ment
Type of Fuel Using Equipment
Date of Installation
Fuel to be Used
Type
Ash Content (%)
Sulphur Content (%)
Other Specifications
Fuel Consumption Rate (kg/h)
Maximum
Normal
Air Pollution Control Equipment
Type
Pollutant to be controlled
Designed Efficiency (%)
Operating Schedule
Operating Hours per Day
Operating Days per Month
6. Drawings

Please provide schematic diagrams of process flow showing the flow of materials, including raw materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers.

* Delete whichever is inapplicable.
(Enacted 1993. L.N. 212 of 1996)