|
Chapter: | 311G
![]() | Title: | AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 | Gazette Number: | |
| Schedule: | 2 | Heading: | FORM | Version Date: | 30/06/1997 |
Name(s) of Owner(s (Surname First) | Status (e.g. lessee, occupier) | Correspondence Address | Telephone Number | Identity Card/Certificate of Incorporation* Number | |
English | Chinese | ||||
Name of Premises | Address | TelephoneNumber | |||||
English | Chinese | ||||||
Contact Person in the Premises (Surname First) | Title or Position | Correspondence Address | TelephoneNumber | ||||
English | Chinese | ||||||
Business Registration No. | Certificate of Incorporation No. | No. of Employees in the Premises | Area of the Premises (m2) | Land Status | |||
Names(s) of Land Owner(s) | Address | TelephoneNumber | |||||
English | Chinese | ||||||
Specified Process referred in Schedule 1 to the Ordinance | ||||||||
Brief Description of Process | ||||||||
Raw materials with Percentage Composition | ||||||||
Products with Percentage Composition | ||||||||
Raw Materials Consumption Rates (tonnes) | Hourly | Normal | Product Production Rates (tonnes) | Hourly | Normal | |||
Maximum | Maximum | |||||||
Daily | Daily | |||||||
Monthly | Monthly | |||||||
Annual | Annual | |||||||
Installed/Processing* Capacity | ||||||||
Total Silo Capacity (For Cement Works only) | ||||||||
Operating Schedule | Normal Operating Hours | From To | ||||||
Operating Hours per Day | ||||||||
Operating Days per Year | ||||||||
Emission Point No. | ||||||||||
Discharge Exit or Chimney Height (m above ground) | ||||||||||
Cross-section of Discharge Exit or Chimney | Width (m) | |||||||||
Length (m) | ||||||||||
Diameter(m) | ||||||||||
Equipment Serving the Emission Point | Type of Equipment | |||||||||
Equipment No. | ||||||||||
Date of Installation | ||||||||||
Dimensions of Equipment | Width (m) | |||||||||
Length (m) | ||||||||||
Height (m) | ||||||||||
Diameter (m) | ||||||||||
Mode of Operation (Continuous/Batch) | ||||||||||
Installed/Processing* Capacity | ||||||||||
For Batch Process | Duration of each Batch (h) | |||||||||
No. of Batches per Day | ||||||||||
For Fuel Using Equip-ment | Type of Fuel Using Equipment | |||||||||
Date of Installation | ||||||||||
Fuel to be Used | Type | |||||||||
Ash Content (%) | ||||||||||
Sulphur Content (%) | ||||||||||
Other Specifications | ||||||||||
Fuel Consumption Rate (kg/h) | Maximum | |||||||||
Normal | ||||||||||
Air Pollution Control Equipment | Type | |||||
Pollutant to be controlled | ||||||
Designed Efficiency (%) | ||||||
Operating Schedule | Operating Hours per Day | |||||
Operating Days per Month |