Contents of Section

Chapter:

215 PDFTitle:EASTERN HARBOUR CROSSING ORDINANCEGazette Number:
Section:3Heading:Variation of planVersion Date:30/06/1997

(1) The Director may, with the agreement of the Road Company, cause the boundaries of the road tunnel area to be varied from time to time.
(2) Where any such boundaries are so varied, the Director shall prepare a new plan fixing the location of and delineating the road tunnel area.
(3) Every new plan prepared in accordance with subsection (2) shall be numbered, dated, signed by the Director and deposited in the Land Registry. (Amended 8 of 1993 s. 2)
(4) Whenever a new plan is deposited under subsection (3), the Director shall cause a notification of such deposit to be published in the Gazette.

(Enacted 1986)