400F PDFTitle:NOISE CONTROL ORDINANCE (EXEMPTION FROM SECTION 6(1) AND (2) (LANTAU FIXED CROSSING)) ORDERGazette Number:
Schedule:1Heading:Version Date:30/06/1997


[paragraph 2]

The locations and the works boundaries for the 24-hour construction of the Lantau Fixed Crossing are more particularly delineated in Drawing Nos. 272/TM/1106 and 272/TM/1107 for the Tsing Ma Bridge Contract and Drawing Nos. 272/KSM/1105 and 272/KSM/1106 for the Kap Shui Mun Bridge/Ma Wan Viaduct Contract deposited in the office of the Highways Department at 10th Floor, Empire Centre at Tsim Sha Tsui East.
(Enacted 1991)