|
Chapter: | 123H | Title: | Building (Refuse Storage and Material Recovery Chambers and Refuse Chutes) Regulations |
: If this pencil mark appears at the beginning of a provision, that provision is subject to amendments that are already in operation but have not yet been incorporated in its text.
| Cap 123H | Empowering section | |
| Cap 123H reg 1 | (Repealed 39 of 2000 s. 7) | |
| Cap 123H reg 2 | Interpretation | |
| Cap 123H reg 3 | Refuse storage and material recovery chambers or material recovery chambers to be provided for in plans relating to buildings specified in the Schedule | |
| Cap 123H reg 3A | Refuse storage and material recovery rooms to be provided for in plans relating to domestic buildings or domestic part of composite buildings | |
| Cap 123H reg 4 | Refuse storage and material recovery chambers to comply with regulations 5 to 12A | |
| Cap 123H reg 4A | Material recovery chambers to comply with regulations 5 to 12A | |
| Cap 123H reg 4B | Refuse storage and material recovery rooms to comply with regulations 8(1), 12A, 12B and 12C | |
| Cap 123H reg 5 | Access to refuse storage and material recovery chambers for emptying refuse containers and recovered materials | |
| Cap 123H reg 6 | Refuse storage and material recovery chambers to be fully enclosed save for door etc. | |
| Cap 123H reg 7 | Refuse storage and material recovery chambers to have one external wall | |
| Cap 123H reg 8 | Minimum dimensions of refuse storage and material recovery chambers | |
| Cap 123H reg 9 | Construction of refuse storage and material recovery chambers | |
| Cap 123H reg 10 | Access door to refuse storage and material recovery chambers and construction thereof | |
| Cap 123H reg 11 | Drainage of refuse storage and material recovery chambers | |
| Cap 123H reg 12 | Refuse storage and material recovery chambers to have water supply point | |
| Cap 123H reg 12A | Mechanical ventilation and air purifying facilities for refuse storage and material recovery chambers | |
| Cap 123H reg 12B | Refuse storage and material recovery rooms to be readily accessible | |
| Cap 123H reg 12C | Refuse storage and material recovery rooms to be provided with adequate lighting | |
| Cap 123H reg 13 | Refuse chutes to comply with regulations 14 to 25 | |
| Cap 123H reg 14 | Bends or offset in any refuse chute prohibited | |
| Cap 123H reg 15 | Minimum height of top of refuse chutes | |
| Cap 123H reg 16 | Lining and internal size of refuse chutes | |
| Cap 123H reg 17 | Walls of refuse chutes | |
| Cap 123H reg 18 | Refuse chute to be provided with shutter | |
| Cap 123H reg 19 | Ventilating pipe for refuse chute | |
| Cap 123H reg 20 | Inspection and cleansing of refuse chute | |
| Cap 123H reg 21 | Construction of internal surface of refuse chute | |
| Cap 123H reg 22 | Situation of hopper | |
| Cap 123H reg 23 | Construction of hopper | |
| Cap 123H reg 24 | Hopper recess | |
| Cap 123H reg 25 | Junction of hopper with refuse chute | |
| Cap 123H | Schedule |